Planned Improvements

2017 Planned Camp Improvements

  •  Build a new and bigger minnow shed
  •    New gas pump
  • ✓  Paint cabins 3, 4 and 5
  •    Paint cabins 1, 2, staff cabins, shop and fish cleaning house
  •    Remodel laundry room
  •    Wood burning stove in cabin 3  
  •    Knotty pine in cabin 3 - in progress
  •    Install new shower in cabin 3 - coming this fall
  •    Redo electrical on main dock - in progress
  • ✓ New 250 Hp motor for Crestliner guide boat

2016 Planned Camp Improvements

  •    Build a new and bigger minnow shed - coming in the spring of 2017
  • ✓ Build a water shed and install a new water system
  • ✓ Expand fish cleaning benches and install new lighting
  •    Paint cabins 5, 6 and 7 - to be continued in 2017
  • ✓ New toilets and stoves in cabins 3, 6 and 7
  • ✓ New 18 foot camp boat
  •  Remodel main dock
  •  Engine overhaul on SlickCraft cruiser
  •    New 250 Hp motor for Crestliner guide boat - coming in 2017
  • ✓ Add a secondary generator
  • ✓ Wood burning stove in cabin 7
  •  Install new shower in cabin 7
  •  Finish the gables of cabin 7

2015 Planned Camp Improvements

  • ✓ Finish knotty pine in cabin 8
  •  Paint main Lodge and cabin 8
  •  Remove large rotting tree in front of main lodge
  •   New tin roof on cabin 7
  • ✓ Level cabin 6
  • Replace the kitchen flooring in cabin 6
  • ✓ Add a second cruiser to our fleet
  • ✓ Build a new crib
  • ✓ Re-deck slip dock walkway
  • ✓ Re-position slip docks to deeper water
  •  Add wood shed to cabin 6
  •  Redo structure and decking of main dock
  • ✓ Add 7 new gas grills
  • ✓ Add new guide boat to our fleet
  • ✓ Redo electrical on slip docks